Projects

Key Lake Road Projects

Morin Lake

Key Points of Interest

  • This property is located over shallow sandstone cover along the highly prospective Wollaston-Mudjatik lithologic trend of the eastern Athabasca Basin.
  • Property lies 20 km to the northwest of the past-producing Key Lake uranium deposits and operational Key Lake mill.
  • The Shift Lake uranium zone is located nine km to the northeast, drill intersections at this zone returned up to 1.09% average U3O8 over 2m (Saskatchewan Ministry of Economy – Mineral Deposit Index Record #2031).
  • The Morin Lake Property comprises three claims totaling 377 hectares and located just within the southeast edge of the Athabasca Basin, Saskatchewan. Fission 3.0 holds 100% ownership of the property. All of the claims were acquired by staking in October 2017.

Qualified Person: The technical information in this website has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Ross McElroy, P.Geol., COO and Chief Geologist for Fission 3.0 Corp., a Qualified Person.



© 2019
All rights reserved.
Disclaimer